August 6, 2023 – The northern foundation wall of the college dormitory have been built, the shaft for the college building elevator has been completed, the concrete floors have been poured for the library section (lower portion) and the office section (mid portion) of the student life building, the upper section of the student life building (refectory/auditorium) has been filled with packable dirt and stone, and an access road on the east side of Alexandria Hall is being filled in.